| Nov.17, 2012 - Ready to rumble! |
| Dec.1, 2012 |
| Dec.3, 2012 - Asbestos removal |
| Asbestos abatement contractor. |
| 1912 original layer of wood siding underneath the newly removed shingles. |
| Dec.8, 2012. The real demolition begins. |
| Digging up the root and stumps. |
| Check out the telephone poles used for the old foundation! |
| Tearing the roof apart and pulling it down. |
| Important: For a "remodel" we must keep 50% of existing walls. |
![]() |
| Soil compaction (garage & carport) |
![]() |
| Getting ready to pour new foundation. |
| January 2013 |
| New poured concrete foundations. |
| Reinforce and brace existing foundation |
| February 2013 |
| Surveying the new family room and kitchen. |
| March 24. Our new guest room. Come visit now, ya'hear? |
| Getting ready to frame the 2nd story. |
| April 2013. Come on up, but be careful! |
| Framing the 2nd story. So exciting! |
| Handcrafted Rafter Tails. April 2013 |
| Each one cut by jigsaw and edges smoothed by a router. |
| Custom-made braces. |
| New windows and upper balcony and back patio. |
| New room |
| Cat5e cable throughout the house. |
| Tyvek waterproof membrane for wood siding. |
| 100% fully sprinklered house, required by the City. |
| Gotta remember where all the wires are before they drywall. |
| Drywall |
| Scratch coat |
| Refurbish the 100 year old lockset. |
| Every piece cleaned and retrofitted. Works like new. |
| Upstairs balcony has a nice view of the neighbors yards. :-) |
| Preparing for siding and scratch coat, browning & stucco. |
| Craftsman interior window and door trim. |
| Henry pre-wiring the stereo, HDMI, Cat5e and coax cables. |
| Composite wood siding. |
| TimberTech composite wood deck. |
| Interior and Exterior Paint and Trim |
| New kitchen with island and walk-in pantry/laundry room. |
| Craftsman details. |
| Farmhouse/Apron sink. |
| Guest bathroom w/ floating vanity. |
| Hot mop - waterproofing the shower stall. |
| Assembling and installing our IKEA closets. |
| Erin's walk-in closet. Incentive to commute to Pepperdine in 2015. |
| "Heal the Bay" and thus install the water infiltration pit required by the City. |
| Prepare the floors & walls for tile. |
| Electrical fixtures installed. |
| "Good fences make good neighbors" as Blair would say. |
| Colorquartz countertop by The Color Marble (Thanks Jessica You!) |
| Dec.2013 |