Nov.17, 2012 - Ready to rumble! |
Dec.1, 2012 |
Dec.3, 2012 - Asbestos removal |
Asbestos abatement contractor. |
1912 original layer of wood siding underneath the newly removed shingles. |
Dec.8, 2012. The real demolition begins. |
Digging up the root and stumps. |
Check out the telephone poles used for the old foundation! |
Tearing the roof apart and pulling it down. |
Important: For a "remodel" we must keep 50% of existing walls. |
![]() |
Soil compaction (garage & carport) |
![]() |
Getting ready to pour new foundation. |
January 2013 |
New poured concrete foundations. |
Reinforce and brace existing foundation |
February 2013 |
Surveying the new family room and kitchen. |
March 24. Our new guest room. Come visit now, ya'hear? |
Getting ready to frame the 2nd story. |
April 2013. Come on up, but be careful! |
Framing the 2nd story. So exciting! |
Handcrafted Rafter Tails. April 2013 |
Each one cut by jigsaw and edges smoothed by a router. |
Custom-made braces. |
New windows and upper balcony and back patio. |
New room |
Cat5e cable throughout the house. |
Tyvek waterproof membrane for wood siding. |
100% fully sprinklered house, required by the City. |
Gotta remember where all the wires are before they drywall. |
Drywall |
Scratch coat |
Refurbish the 100 year old lockset. |
Every piece cleaned and retrofitted. Works like new. |
Upstairs balcony has a nice view of the neighbors yards. :-) |
Preparing for siding and scratch coat, browning & stucco. |
Craftsman interior window and door trim. |
Henry pre-wiring the stereo, HDMI, Cat5e and coax cables. |
Composite wood siding. |
TimberTech composite wood deck. |
Interior and Exterior Paint and Trim |
New kitchen with island and walk-in pantry/laundry room. |
Craftsman details. |
Farmhouse/Apron sink. |
Guest bathroom w/ floating vanity. |
Hot mop - waterproofing the shower stall. |
Assembling and installing our IKEA closets. |
Erin's walk-in closet. Incentive to commute to Pepperdine in 2015. |
"Heal the Bay" and thus install the water infiltration pit required by the City. |
Prepare the floors & walls for tile. |
Electrical fixtures installed. |
"Good fences make good neighbors" as Blair would say. |
Colorquartz countertop by The Color Marble (Thanks Jessica You!) |
Dec.2013 |